Home
Introduction
Personnel
Project Management
Environmental and Engineering Services
Phase I Project Clients
Phase II Project Clients
UST and Gasoline Station
Project Clients
Selected Project
Descriptions
Contact Us
|
|
VCUP and Remediation
Name: Centennial
Lake Park Expansion and Voluntary Cleanup
Location: 2501 West
Union Avenue
Englewood,
Colorado
Size: 10
acres
Owner/ Client: City
of Englewood
Prime Contractor: E-21 Engineering, Inc.
Project Description: E-21 conducted Phase 1 and
Phase 2 investigations on two parcels of land, which contained an
old, closed solid waste landfill operated by the city in the early
1960’s. Situated between the South Platte River and Centennial
Lake Park, the land was desired to expand the park and connect to
the South Platte River trail system operated by South Suburban Parks
and Rec. E-21 prepared a comprehensive Voluntary Cleanup Plan (VCUP)
for this hydrogeologically complex lake, groundwater, river, and
landfill waste system. After state approval, E-21 constructed a
closure and monitoring system including constructing a 1.5 to 5-foot
thick clay cover and topsoil/turf system with a subsurface irrigation
drain system above the clay cover. Other work included installing
a electrical blower-powered methane gas trench and venting system
to comply with property boundary explosive gas limits.
E-21 continues to conduct semi-annual monitoring of groundwater
and landfill gas under the VCUP agreement.
Contact: Rick Kahm, Director of Public Works
City
of Englewood
|