Hydrogeologic Investigations
E-21 personnel have conducted greater than 200 hydrogeologic investigations.
Studies have been completed in association with hazardous materials
release, water resources, Phase II Environmental Site Assessments,
underground storage tanks, and former and current process settling
ponds. Sites have including sites contaminated with petroleum, heavy
metals, volatile organic compounds, PCBs, and herbicides/pesticides.
Many of these projects were carried to remedial design or clean-up
stage.
Clean-up and water resource investigations regularly include aquifer
testing. These tests include hydraulic conductivity evaluation through
simple K-tests to full-scale 3-day pump tests. Data derived from
aquifer analyses allow evaluation of groundwater quantity and flow
velocity. Aquifer dewatering activities, including baseline monitoring
of groundwater quantity and quality, are regularly performed in
the coal bed methane industry, a major group of E-21 clients.
E-21 personnel also provide investigation, analyses, and permitting
assistance for waste water pit and NPDES discharge permitting for
oil and gas production fields. E-21 is currently providing groundwater
discharge pit and NPDES permitting assistance for two coal-bed methane
production fields.
|